Page 56 - Msingi Afrika Magazine Issue 15
P. 56

Innovate Afrika




          line. The project, which is funded   transport a lot of  Iron Ore deposits from   China Civil Engineering Construc-
          by China`s Exim Bank and the       the North East through the Port Har-  tion Corporation (CCECC). The
          Nigerian government, is being built   court – Maiduguri rail. The completion of    project was started in March 2017.
          in segments to spread the cost over   this project which we hope that if  it doesn’t   The line is now in service and has
          time.                              start this year, will start the first quarter   10 stations.
                                             of  next year, the completion, will move
          The new metro light rail system in   cargo, create employment, create industrial   The main station is in Lagos and
          Abuja will be connected to the Na-  development and it will grow the economy.”  will act as the operations centre as
          tional Rail Network. Abuja Airport                                    well as a passenger terminus. Ini-
          is also connected to the new metro   Transport Minister Amaechi       tially 3 pairs of trains will run each
          network and the city centre (Abuja’s   explained that ports and rail work   day. The maximum capacity that the
          Central Business District). The Abu-  together:                       project is designed to accommodate
          ja Metro is the first light rail system                               is an incredible 15 pairs (inward and
          in West Africa. The metro relieves   “Currently, Nigerians move about 30   outward bound) per day!
          traffic congestion, is reliable, fast   million cargoes between Lagos and Kano
          and safe, and cheaper than local tax-  in a year. The capacity of  the Nigerian   The building which is still under
          is.The metro will link Abuja with the   Railway Corporation as of  today is about   construction, will be a colossal
          towns of Nyanya, Kubwa, Mararaba   200,000 cargoes per year. That’s appall-  11,200 square meters. It will be the
          and Lugbe in the near future.      ing. So, if  you want to make the factors   largest railway station in West Africa
                                             of  production to be cheap and make our   with a capacity for 6000 passengers.
          Expansion is planned for the ports   goods competitive, then you must provide   It was hoped that the building will
          at Lekki and Bonny to make them    logistics, either the road, by air or by rail-  be completed by the end of 2020.
          deep water harbours of between 17   way. But the cheapest form of  transport
          -18 metres deep. A new river port   in this regard is the railway because it’s   Investment in infrastructure leads to
          will be built at Warri and Ibom.   subsidised by the government. So the idea   the growth of ancillary industries.
                                             of  complying with the instruction by the   In the case of the Nigerian Rail-
          Lekki Port expansion is under      president that all railways must terminate   way Modernization Project, a new
          construction. It will be Nigeria`s   at the seaport is because you want to move   factory in Kajola, Ogun Province is
          deepest sea port and is situated   your cargo. The moment you begin to move   just one example. The factory will
          in the Lagos Free Trade Zone. It   cargo, you’ll see the transformation. The   bring an initial 5000 jobs and will be
          will be one of the most modern     movement of  cargo will improve the indus-  manufacturing the rolling stock for
          in West Africa. Minister of Trans-  trial development of  Nigeria.”   the new, modernized railways. It will
          port, Chibuike Rotimi Amaechi, has                                    then proceed to supplying the rest
          tasked the project managers with   The Lagos to Calabar line will run   of West Africa and beyond!
          commencement of commercial         along the coast.  It will be 1,400 km
          activities by 2022.                and will link all the key sea and river   This rolling stock, the carriages, are
                                             ports.It will run from Calabar – Uyo   super modern. Each compartment
          The Port Harcourt-Maiduguri rail   – Aba – Port Harcourt – Yenogua –   is not only luxurious and spacious
          line will link the north eastern   Otuoke – Ughelli – Warri – Sapele –   but is also equipped with phone
          region to the eastern sea port of   Benin – Ore – Ijebu-Ode – Lagos.  charging facilities for each seat.
          Bonny which has been approved                                         There are overhead luggage com-
          already, work will commence soon.   The Abuja to Kaduna rail line is   partments, tables, adjustable seats,
          From Bonny the line will go to Port   completed and in service since 2016.   bar and restaurant facilities and
          Harcourt – Aba- Umuahia – Enugu    It is 186km long. Itakpe-Warri line is   each compartment has a television
          – Makurdi – Lafia – Jos – Kafan-   completed which is 326 kilometres   screen.
          chan – Bauchi – Gombe – Damatu-    long.
          ru, and Maiduguri, with a spur from                                   Nigeria: Value Addition in Agricul-
          Port Harcourt to Owerri.           The Lagos-Ibadan line is the first   ture
                                             double-track standard gauge modern
          According to the Transport Minister   railway in West Africa.It is 156km   In 2015, Nigeria initiated the Value
          Amaechi :                          long. Track-laying of the high speed   Chain Development Program that
          “Where we have about two seaports or riv-  standard gauge railway from Lagos   is improving cassava and rice value
          er ports in Port Harcourt, you’ll be able to   to Ibadan was constructed  by the   chains for small farmers in target-



        56        |   we tell the true afrikan story
   51   52   53   54   55   56   57   58   59   60   61